Planning a close substation 400kv GIS with 17 bays, 12 Gas turbines 45MW each, and 2 Steam turbines 130MW each. Reviewing, approval and signing the design of the American company S&L.
Power Plant with 2 Gas turbines 45MW each and a steam production 28MW in A combined cycle, includes building new open sub stations to absorb 2 new turbines and new power input to the plant.
Building a gas power plant to the Orapa Diamonds mining plant with 2 Gas turbines 45MW each.
A cogeneration power plant of 1*50MW & 1*60MW G.T.G and steam production. The P.P supplies directly the power to a refinery plant at 22KV and the rest of the power to the grid through a 161/22KV substation.
A combined cycle and cogeneration Power plant of 1*48MW G.T.G and 1*15MW S.T.G and steam production.
A combined cycle Power plant of 500MVA. Reviewing, approval and signing the design of the Korean engineering company POSCO.